Sat, 26 Dec 2020

Construction resumes

Robert was back at it after dinner.

His parents were nice enough to clean up while he was building.

And Sarah popped the chocolate molten lava cakes into the oven.

Robert was sure to need a bit more sustenance to finish up.

 

It was really taking shape by now.

And clearly it was going to be very cool when completed.

And Robert was really focused on finishing it in one day.

One, long, long day…

 


edit this blog...
HTML hints

Title:
Body:
If you use these in order for jpg files, the links below each upload should work; if the files are jpgs, change the extension on the link; if you go out of order, you're on your own... you will likely need to monkey with the sizes...
File 1:
link to as:
<div class="Embed-container Ratio-4-3">
ALT=" " BORDER="0"></A>
</div>
File 2:
link to as:
<div class="Embed-container Ratio-4-3">
ALT=" " BORDER="0"></A>
</div>
File 3:
link to as:
<div class="Embed-container Ratio-4-3">
ALT=" " BORDER="0"></A>
</div>
Minor edit:
Tags:
Tags List:

Alexandria Baseball Birchmere Bird_Buddy Canoe Celebrations Christmas Covid Decatur Diving First_Day Ice Inflatable James_River Kayak Kitties Lego Music Outer_Banks Packraft Passings Photography Potomac_River Programming Protests Raft Rappahannock_River Remodel Running SUP School Seattle Shenandoah_River Snow Soccer Technology Trips Ultimate Visits Volleyball

Password:
Back to the Blog